Rolla Road bridge maintenance in Dawson Creek has now been completed.
The bridge maintenance and road alignment was done to help ensure safety on the bridge, especially during future flood events.
The new bridge replaces the old crossing and is built to modern day safety standards. This was one of the sites that experienced severe flooding in 2016 since the road goes down into a valley.
The $25 million project will also accommodate overweight and over-dimensional transport loads.